Aomori Site Complex

Rokkasho Nuclear Infrastructure

Occupying 380 hectares across the Shimokita Peninsula, the Rokkasho complex integrates domestic uranium enrichment, spent fuel reprocessing, and vitrified residue containment within hardened industrial envelopes.

Operational Sectors

Integrated Cycle Facilities

MOX Fuel Fabrication Plant

Blends recovered uranium and plutonium dioxides into mixed oxide fuel assemblies for domestic boiling and pressurized water reactors under strict containment.

Low-Level Waste Burial Center

Engineered multi-barrier vaults securely stabilize consolidated dry and liquid plant effluents deep within bedrock formations with continuous hydrological surveillance.

Spent Fuel Reprocessing Plant

The site flagship manages shearing, chemical separation, and vitrification with an annual throughput capacity of 800 tons of heavy metal, housed inside seismically isolated concrete cells.

Structural Engineering

Engineered for maximum seismic acceleration and external impact containment.

Every primary processing cell rests on independent bedrock footings with subterranean base isolation dampers, engineered reinforced concrete barrier walls up to 1.8 meters thick, and redundant emergency power ventilation circuits.

Institutional Site Inspections

Accredited technical observers, municipal delegations, and academic research teams can request scheduled access through our public affairs division.